Well, we started to grout the shower. Then we ran out of grout. I sure hope there's not some dire consequence to allowing half your grout project to dry before doing the other half. I mean we didn't let big glops dry on the tile or anything. I will say that I'd be perfectly happy if this turns out to be the last time I ever have to grout.

I also hauled the debris from demoing the old hardboard travesty in the midst of a blizzard. It snowed for 20 minutes today and I spent the whole time at the dump. Good times.

241.3. Sigh.